Commissioning of TF system
Experienced engineer shares his thoughts on points to be checked before commissioning Thermic fluid system. Checking Piping, Instrumentation, Expansion loop, leak test, Insulation, oil sampling etc ensures smooth working. A checklist provides all points so that a datum line is formed. Comparison to datum line helps in solution related to carbonisation, choking, heat transfer, oil analysis reports etc.

In the previous PPT/Blog, we discussed about “Connecting Utilities”
We discussed about the various solutions.
Refer the link to visit the blog again:
http://www.thermicfluidsystem.com/blog-1/connecting-utilities-in-series